Nagpur Betul Project
4- Laneing of Nagpur-Betul Section of NH-69 from Km. 137.000 to Km. 257.000 in the State of Madhya Pradesh and from Km 3.000 To Km 59.300 in the State of Maharashtra under NHDP Phase IV on Design, Build, Finance, Operate and Transfer (Annuity) basis.
As per the provisions of the Concession Agreement the Concessionaire has successfully completed the construction of following items:
4- Laneing of Nagpur-Betul Section of NH-69 from Km. 137.000 to Km. 257.000 in the State of Madhya Pradesh and from Km 3.000 To Km 59.300 in the State of Maharashtra under NHDP Phase IV on Design, Build, Finance, Operate and Transfer (Annuity) basis.
As per the provisions of the Concession Agreement the Concessionaire has successfully completed the construction of following items:
i.
|
4-Laning of Project Highway (Total length)
a)
Rigid Pavement
b)
Flexible Pavement
|
75.845 Kms.
98.667 Kms.
|
174.512 Kms.
|
|
ii.
|
Service Roads (Flexible Pavement)
|
20.385 Kms.
|
||
iii.
|
Grade Separated Intersections
|
6 Nos.
|
||
iv.
|
Vehicular Underpasses (VUPs)
|
11 Nos.
|
||
v.
|
Pedestrian and Cattle Underpasses (PUPs)
|
15 Nos.
|
||
vi.
|
Construction of New Major Bridges
a) 5 span
of 30 meters
b) 2 span
of 29 meters
c) 5 span
of 19 meters
d) 2 span
of 29 meters
e) 3 span
of 19 meters
f) 3 span
of 27.9 meters
g) 5 span of
20 meters
h) 4 span
of 20 meters
i)
3 span of 20 meters
j)
5 span of 20.6 meters
|
150 Mtrs.
58 Mtrs.
95 Mtrs.
58 Mtrs.
57 Mtrs.
83.7 Mtrs.
100 Mtrs.
80 Mtrs.
60 Mtrs.
103 Mtrs.
|
10 Nos.
|
|
vii.
|
Minor Bridges
|
55 Nos.
|
||
viii.
|
Railway Over Bridges (ROBs)
|
6 Nos.
|
||
ix.
|
Culverts etc.
|
252 Nos.
|
||
x.
|
Toll Plazas
|
2 Nos.
|
||
xi.
|
Supply, Laying and Commissioning of Optical Fibre Cables (OFC)
|
175.316 Kms.
|
Date of commencement of Project:
|
20.01.2012
|
Contractual Date of Commissioning:
|
17.07.2015
|
Actual Date of Commissioning:
|
18.02.2015
|
Client:
|
National Highways Authority of India
|